Friday, May 13, 2016

MORE POST OFFICE PRE-DEMOLITION WORK TODAY; MORE PARKING LIMITS

Latest from the Township:

On Friday, May 13th, JMF will begin installing fencing and pedestrian safeguards around 160 Maplewood Ave.

The MPD will have signs posted from early morning, and will be present at the site during work time to assist with circulation.

During this work, parking spots around the perimeter of the building will be unavailable. Specifically, there will be no parking in the Village Coffee lot on the north side, adjacent to the building. There will also be no parking on the south side of the entrance to Ricalton Square, adjacent to the building.

No comments:

Post a Comment